DENHAM CP | DENHAM | S106 SCHEME | S106 DENHAM LOCAL PRIORITY | PEDESTRIAN REFUGE UPGRADE AND FOOTWAY IMPROVEMENT SCHEME | A4020 OXFORD ROAD NR JUNCTION OF WILLOW AVENUE | 23/01/2023 | 10/03/2023 |
AMERSHAM CP | AMERSHAM & CHESHAM BOIS | NETWORK SAFETY SCHEME 2022-23 | PEDESTRIAN SAFETY IMPROVEMENT | FOOTWAY REALIGNMENT | A4154 WOODSIDE ROAD AMERSHAM | 02/01/2023 | 13/02/2023 |
ASTON CLINTON CP | ASTON CLINTON & BIERTON | S106 SCHEME | S106 SCHEME | TFB150 INTRODUCTION OF NEW TRAFFIC CALMING FEATURES | ASTON CLINTON | 22/12/2022 | 22/02/2023 |
CHESHAM CP | CHESS VALLEY | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | REPLACE 1590M OF 4" SI WITH 90MM AND ASSOCIATED SERVICES | BOTLEY ROAD, CHESHAM | 05/09/2022 | 20/01/2023 |
NON-CIVIL PARISH OR COMMUNITY | TERRIERS & AMERSHAM HILL | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | WORKS CARRIED OUT BY MORRISON ENERGY SERVICES WORKING ON BEHALF OF CADENT | BRANDS HILL AVENUE, HIGH WYCOMBE | 19/09/2022 | 13/01/2023 |
AYLESBURY CP | AYLESBURY EAST | FOOTWAY MAINTENANCE 2022-23 | FOOTWAY RESURFACING - PACKAGE 3 | FOOTWAY RESURFACING & ASSOCIATED REPAIRS | BROUGHTON AVENUE, AYLESBURY | 17/10/2022 | 31/01/2023 |
BIERTON CP | ASTON CLINTON & BIERTON | COMMUNITY BOARD SCHEME 2022-23 | BURCOTT LANE PARKING RESTRICTIONS | DOUBLE YELLOW LINES | BURCOTT LANE JCT AYLESBURY ROAD, WENDOVER | 13/01/2023 | 13/01/2023 |
TWYFORD CP | GRENDON UNDERWOOD | TTRO: CARRIAGEWAY, VERGE | WORKS BY: HS2 LTD | TWO-WAY SIGNALS | GAWCOTT ROAD, TWYFORD - HWM - 2272 | 16/01/2023 | 29/01/2023 |
NON-CIVIL PARISH OR COMMUNITY | TOTTERIDGE & BOWERDEAN | COMMUNITY BOARD SCHEME 2022-23 | INSTALLATION OF BOLLARDS | INSTALLATION OF BOLLARDS TO PREVENT ANTISOCIAL PARKING AND IMPEDED JUNCTION VISIBILITY | HILLVIEW ROAD, HIGH WYCOMBE | 23/01/2023 | 27/01/2023 |
AYLESBURY CP | AYLESBURY NORTH WEST | TTRO: CARRIAGEWAY, FOOTWAY, VERGE | WORKS BY: THAMES WATER | ROAD CLOSURE | HOLLAND ROAD, AYLESBURY - FROM JUNC OF STONEHAVEN RD TO OUTSIDE NO 5 | 14/11/2022 | 13/01/2023 |
HAZLEMERE CP | HAZLEMERE | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | INKERMAN DRIVE, HAZLEMERE | 03/10/2022 | 23/01/2023 |
MARLOW CP | MARLOW | CYCLIC GULLY CLEANING | GULLY CLEARING | HIGH PRESSURE JETTING/CCTV | MARLOW | 01/12/2022 | 31/01/2023 |
MULTIPLE PARISHES | THE RISBOROUGHS | CYCLIC GULLY CLEANING | GULLY CLEARING | HIGH PRESSURE JETTING/CCTV | RISBOROUGHS | 01/12/2022 | 31/01/2023 |
MARLOW CP | MARLOW | FOOTWAY MAINTENANCE 2022-23 | FOOTWAY RESURFACING - PACKAGE 4 | FOOTWAY RESURFACING & ASSOCIATED REPAIRS | STATION ROAD, MARLOW | 06/02/2023 | 10/02/2023 |
CUBLINGTON CP | WING | CONVENTIONAL RESURFACING 2022-23 | CONVENTIONAL ROAD RESURFACING - SPL STABILISATION & CONVENTIONAL | ROAD RESURFACING - TFB220032 | STEWKLEY ROAD, CUBLINGTON | 12/01/2023 | 16/01/2023 |
NON-CIVIL PARISH OR COMMUNITY | TOTTERIDGE & BOWERDEAN | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | TOTTERIDGE ROAD, HIGH WYCOMBE | 10/10/2022 | 13/01/2023 |
AYLESBURY CP | AYLESBURY NORTH | COMMUNITY BOARD SCHEME 2022-23 | AYLESBURY DROPPED KERBS | AYLESBURY DROPPED KERBS | VARIOUS LOCATIONS | 20/01/2023 | 09/02/2023 |
STEEPLE CLAYDON CP | GRENDON UNDERWOOD | TTRO: CARRIAGEWAY | WORKS BY: BUCKINGHAMSHIRE COUNCIL | GIVE AND TAKE | VICARAGE LANE, STEEPLE CLAYDON - WHOLE LENGTH | 09/01/2023 | 03/03/2023 |
STEEPLE CLAYDON CP | GRENDON UNDERWOOD | FOOTWAY MAINTENANCE 2022-23 | FOOTWAY RESURFACING - PACKAGE 3 | FOOTWAY RESURFACING & ASSOCIATED REPAIRS | VICARAGE LANE, STEEPLE CLAYDON | 09/01/2023 | 03/02/2023 |
LITTLE CHALFONT CP | LITTLE CHALFONT & AMERSHAM COMMON | FOOTWAY MAINTENANCE 2022-23 | FOOTWAY RESURFACING - PACKAGE 4 | FOOTWAY RESURFACING & ASSOCIATED REPAIRS | YARROWSIDE, LITTLE CHALFONT | 13/12/2022 | 13/01/2023 |
NON-CIVIL PARISH OR COMMUNITY | TOTTERIDGE & BOWERDEAN | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | WINDRUSH DRIVE, HIGH WYCOMBE - WHOLE STREET FROM J/O HUGHS AVENUE TO J/O HATTERS LANE | 21/11/2022 | 25/01/2023 |
GERRARDS CROSS CP | DENHAM | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | FULMER ROAD, GERRARDS CROSS | 23/11/2022 | 20/01/2023 |
BUCKINGHAM CP | BUCKINGHAM EAST | TTRO: CARRIAGEWAY, FOOTWAY, VERGE | WORKS BY: SWISH FIBRE LTD | MULTI-WAY SIGNALS | HILLTOP AVENUE, BUCKINGHAM - BOTH ENTRANCES FROM PAGE HILL AVENUE - WHOLE ROAD | 17/11/2022 | 01/02/2023 |
CHESHAM CP | CHESS VALLEY | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | MULTI-WAY SIGNALS | LYE GREEN ROAD, CHESHAM - START AT JUNCTION WITH CODMORE CROSS AND END O/S 174 | 07/11/2022 | 24/03/2023 |
QUAINTON CP | GREAT BRICKHILL | TTRO: CARRIAGEWAY, FOOTWAY, VERGE | WORKS BY: UK POWER NETWORKS EASTERN & LONDON | ROAD CLOSURE | STATION ROAD, QUAINTON - OPP 155/157 | 16/01/2023 | 20/01/2023 |
GERRARDS CROSS CP | GERRARDS CROSS | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | DUKES WOOD AVENUE, GERRARDS CROSS - FROM J/O FULMER ROAD TO O/S NO.44 | 23/11/2022 | 03/02/2023 |
NON-CIVIL PARISH OR COMMUNITY | TOTTERIDGE & BOWERDEAN | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | UNDERWOOD ROAD, HIGH WYCOMBE - S/O 125 UNDERWOOD ROAD TO S/O NO 176 BOWERDEAN ROAD | 01/12/2022 | 17/02/2023 |
NON-CIVIL PARISH OR COMMUNITY | TOTTERIDGE & BOWERDEAN | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | HILLVIEW ROAD, HIGH WYCOMBE - WHOLE STREET FROM J/O ARNISON AVENUE TO O/S NO.53 | 16/01/2023 | 03/03/2023 |
DOWNLEY CP | DOWNLEY | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | PLOMER HILL, HIGH WYCOMBE - WHOLE STREET FROM J/O PLOMER GREEN LANE TO O/S NO.17 | 18/11/2022 | 17/01/2023 |
WOOBURN CP | THE WOOBURNS, BOURNE END & HEDSOR | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | BROOKFIELD ROAD, WOOBURN - FROM O/S NO.36 TO J/O BROOKBANK | 03/01/2023 | 06/02/2023 |
BOARSTALL CP | GRENDON UNDERWOOD | CONVENTIONAL RESURFACING 2022-23 | CONVENTIONAL ROAD RESURFACING - SPL STABILISATION & CONVENTIONAL | EXTENDING FROM HONEYBURDGE TO COUNTY BOUNDARY - TFB220022 | STUDLEY ROAD, BOARSTALL | 09/01/2023 | 13/01/2023 |
NON-CIVIL PARISH OR COMMUNITY | TOTTERIDGE & BOWERDEAN | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | WINDRUSH DRIVE, HIGH WYCOMBE - WHOLE STREET FROM J/O HUGHS AVENUE TO J/O HATTER€™S LANE | 21/11/2022 | 25/01/2023 |
PADBURY CP | WINSLOW | TTRO: CARRIAGEWAY, FOOTWAY, VERGE | WORKS BY: GIGACLEAR LIMITED | ROAD CLOSURE | OLD END, PADBURY - WHOLE STREET OF OLD END | 03/01/2023 | 19/01/2023 |
AMERSHAM CP | AMERSHAM & CHESHAM BOIS | NETWORK SAFETY SCHEME 2022-23 | JUNCTION IMPROVEMENT | DRAINAGE & ROUNDABOUT IMPROVEMENT WORKS | WOODSIDE, AMERSHAM (JCT WITH CHILTERN AVE) | 19/01/2023 | 01/02/2023 |
NORTH MARSTON CP | GREAT BRICKHILL | COMMUNITY BOARD SCHEME 2022-23 | KERBING | | SCHOOL HILL, NORTH MARSTON | 13/02/2023 | 17/02/2023 |
NON-CIVIL PARISH OR COMMUNITY | ABBEY | STRUCTURES MAINTENANCE | MAINTENANCE & PRESERVATION | PHASE 3 - DECK JOINT & WATERPROOFING SURVEY | ABBEY WAY ELEVATED ROAD, HIGH WYCOMBE | 03/02/2023 | 09/03/2023 |
AYLESBURY CP | AYLESBURY NORTH WEST | TTRO: CARRIAGEWAY | WORKS BY: BUCKINGHAMSHIRE COUNCIL | MULTI-WAY SIGNALS | RABANS LANE, AYLESBURY - BETWEEN BRUNEL RD AND RABANS CLOSE | 05/12/2022 | 27/01/2023 |
WOOBURN CP | THE WOOBURNS, BOURNE END & HEDSOR | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | GROVES CLOSE, CORES END - FROM O/S NO.3 TO J/O PRINCES ROAD | 02/01/2023 | 17/01/2023 |
WOOBURN CP | THE WOOBURNS, BOURNE END & HEDSOR | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | BROOKHOUSE DRIVE, CORES END - WHOLE STREET FROM J/O KILN LANE TO O/S NO.4 | 02/01/2023 | 17/01/2023 |
CHALFONT ST PETER CP | CHALFONT ST PETER | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | LAMBSCROFT WAY, CHALFONT ST PETER - J/O SCHOOL LANE TO O/S NO 11 | 03/01/2023 | 17/01/2023 |
CHALFONT ST PETER CP | CHALFONT ST PETER | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | TWO-WAY SIGNALS | MARKET PLACE, CHALFONT ST PETER - FROM J/O GOLD HILL EAST, TO J/O THE VALE | 03/01/2023 | 23/01/2023 |
GERRARDS CROSS CP | GERRARDS CROSS | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | MARSHAM LANE, GERRARDS CROSS - J/O MARSHAM LODGE TO J/O MARSHAM WAY | 02/01/2023 | 24/01/2023 |
GERRARDS CROSS CP | GERRARDS CROSS | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | MARSHAM LODGE, GERRARDS CROSS - J/O MARSHAM LANE TO O/S NO 11 | 02/01/2023 | 30/01/2023 |
GERRARDS CROSS CP | GERRARDS CROSS | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | FULMER WAY, GERRARDS CROSS - J/O MARSHAM WAY TO J/O MARSHAM LANE | 02/01/2023 | 30/01/2023 |
BURNHAM CP | FARNHAM COMMON & BURNHAM BEECHES | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | OPENDALE ROAD, BURNHAM - FROM J/O STOMP ROAD, TO O/S NO.23 | 03/01/2023 | 30/01/2023 |
WOOBURN CP | THE WOOBURNS, BOURNE END & HEDSOR | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | PRINCES ROAD, CORES END - FROM J/O CORES END ROAD TO J/O GROVES CLOSE | 02/01/2023 | 06/02/2023 |
WOOBURN CP | THE WOOBURNS, BOURNE END & HEDSOR | TTRO: FOOTWAY | WORKS BY: CADENT GAS LIMITED | NO CARRIAGEWAY INCURSION | WOOBURN FOOTPATH 3, WOOBURN - FROM OPPOSITE JERSEY COTTAGE TO J/O KILN LANE | 02/01/2023 | 06/02/2023 |
HAZLEMERE CP | HAZLEMERE | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | ST JOHNS AVENUE, TYLERS GREEN - WHOLE STREET FROM J/O ST. JOHN€™S ROAD TO O/S NO.14 | 03/01/2023 | 06/02/2023 |
DOWNLEY CP | DOWNLEY | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | MIDDLEBROOK ROAD, HIGH WYCOMBE - JUNCTION OF SOUTHFIELD ROAD TO O/S NO 42 | 03/01/2023 | 06/02/2023 |
GERRARDS CROSS CP | GERRARDS CROSS | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | DUKES RIDE, GERRARDS CROSS - WHOLE STREET FROM J/O DUKES WOOD DRIVE TO O/S NO.9 | 03/01/2023 | 06/02/2023 |
GERRARDS CROSS CP | DENHAM | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | GAVIOTS WAY, GERRARDS CROSS - FROM J/O FULMER ROAD TO O/S NO.44 | 07/01/2023 | 10/02/2023 |
WOOBURN CP | THE WOOBURNS, BOURNE END & HEDSOR | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | HAWKS HILL, BOURNE END - FROM O/S THE CHALET TO S/O COPPERS BEECHES | 02/01/2023 | 13/02/2023 |
WOOBURN CP | THE WOOBURNS, BOURNE END & HEDSOR | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | KILN LANE, CORES END - FROM J/O CORES END ROAD TO OPPOSITE HEATH VIEW | 02/01/2023 | 13/02/2023 |
WOOBURN CP | THE WOOBURNS, BOURNE END & HEDSOR | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | CLAYTONS MEADOW, BOURNE END - J/O HEDSOR ROAD TO O/S NO 10 | 03/01/2023 | 13/02/2023 |
CHEPPING WYCOMBE CP | TYLERS GREEN & LOUDWATER | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: THAMES WATER | MULTI-WAY SIGNALS | WHEELER AVENUE, TYLERS GREEN - FROM OUTSIDE NO 48 TO OUTSIDE NO 27 | 03/01/2023 | 17/02/2023 |
WOOBURN CP | THE WOOBURNS, BOURNE END & HEDSOR | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | ABNEY COURT DRIVE, BOURNE END - FROM J/O HEDSOR ROAD TO O/S ABNEY THATCH | 03/01/2023 | 20/02/2023 |
GERRARDS CROSS CP | GERRARDS CROSS | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | FULMER ROAD, GERRARDS CROSS - WHOLE STREET FROM J/O OXFORD ROAD TO J/O GAVIOTS CLOSE | 03/01/2023 | 27/02/2023 |
FARNHAM ROYAL CP | FARNHAM COMMON & BURNHAM BEECHES | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | BADGERS WOOD, FARNHAM COMMON - O/S PINEWOOD | 03/01/2023 | 27/02/2023 |
GERRARDS CROSS CP | DENHAM | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | GAVIOTS GREEN, GERRARDS CROSS - WHOLE STREET FROM C/O NO.12 TO J/O FULMER ROAD | 07/01/2023 | 03/03/2023 |
CHALFONT ST PETER CP | CHALFONT ST PETER | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | TWO-WAY SIGNALS | GOLD HILL EAST, CHALFONT ST PETER - WHOLE STREET FROM J/O MARKET PLACE TO J/O GOLD HILL WEST | 03/01/2023 | 06/03/2023 |
GERRARDS CROSS CP | DENHAM | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | GAVIOTS CLOSE, GERRARDS CROSS - WHOLE STREET FROM J/O FULMER ROAD TO NO.37 | 07/01/2023 | 10/03/2023 |
HAZLEMERE CP | HAZLEMERE | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | ST JOHNS ROAD, TYLERS GREEN - WHOLE STREET FROM J/O MANOR ROAD TO J/O NEW ROAD | 03/01/2023 | 15/03/2023 |
NON-CIVIL PARISH OR COMMUNITY | ABBEY | STRUCTURES MAINTENANCE | MAINTENANCE & PRESERVATION | PHASE 2 - CROSSHEAD INSPECTION | ABBEY WAY ELEVATED ROAD, HIGH WYCOMBE | 19/12/2022 | 31/01/2023 |
ADDINGTON CP | WINSLOW | TTRO: CARRIAGEWAY | WORKS BY: NETWORK RAIL | ROAD CLOSURE | VERNEY ROAD, ADDINGTON | 09/01/2023 | 20/01/2023 |
BEACONSFIELD CP | BEACONSFIELD | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) | ROAD CLOSURE | AYLESBURY END, BEACONSFIELD - NEST TO NO 19 | 09/01/2023 | 13/01/2023 |
BEACONSFIELD CP | GERRARDS CROSS | TTRO: CARRIAGEWAY | WORKS BY: BUCKINGHAMSHIRE COUNCIL | MULTI-WAY SIGNALS | LONDON END, BEACONSFIELD - LONDON END ROUNDABOUT, MINERVA WAY. | 09/01/2023 | 13/02/2023 |
HUGHENDEN CP | RIDGEWAY EAST | TTRO: CARRIAGEWAY, VERGE | WORKS BY: THAMES WATER | ROAD CLOSURE | HULCOTT LANE, BIERTON - FROM OUTSIDE OLD SCHOOL HOUSE TO NEAR JUNCTION A418 | 09/01/2023 | 24/02/2023 |
CHOLESBURY-CUM-ST LEONARDS CP | CHILTERN RIDGES | TTRO: CARRIAGEWAY, FOOTWAY, VERGE | WORKS BY: BT | ROAD CLOSURE | CHOLESBURY LANE, BUCKLAND COMMON - FROM OUTSIDE HILL SIDE TO THE JUNCTION AT SPRINGHALL HILL | 09/01/2023 | 13/01/2023 |
BURNHAM CP | CLIVEDEN | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | ROAD CLOSURE | HOGFAIR LANE, BURNHAM - CARRIAGEWAY OUTSIDE OF NO. 26 HOGFAIR LANE | 14/01/2023 | 14/01/2023 |
CHALFONT ST GILES CP | CHALFONT ST GILES | TTRO: CARRIAGEWAY, VERGE | WORKS BY: SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) | ROAD CLOSURE | COKES LANE, CHALFONT ST GILES - AT THE JUNCTION WITH HAREWOOD DOWNS GOLF CLUB | 16/01/2023 | 23/01/2023 |
CHESHAM CP | CHESS VALLEY | TTRO: CARRIAGEWAY | WORKS BY: THAMES WATER | ROAD CLOSURE | WEY LANE, CHESHAM - JUNCTION OF CHURCH STREET | 14/01/2023 | 15/01/2023 |
CHESHAM CP | CHESS VALLEY | TTRO: CARRIAGEWAY | WORKS BY: THAMES WATER | ROAD CLOSURE | MISSENDEN ROAD, CHESHAM - JUNCTION OF WEY LANE | 14/01/2023 | 15/01/2023 |
CHOLESBURY-CUM-ST LEONARDS CP | CHILTERN RIDGES | TTRO: CARRIAGEWAY, FOOTWAY, VERGE | WORKS BY: BT | ROAD CLOSURE | CHOLESBURY LANE, CHOLESBURY - FROM AT THE JUNCTION WITH PARROTS LANE TO OUTSIDE HILLSIDE | 09/01/2023 | 13/01/2023 |
GERRARDS CROSS CP | GERRARDS CROSS | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | VICARAGE WAY, GERRARDS CROSS - J/O MARSHAM WAY TO J/O MILL LANE | 09/01/2023 | 03/03/2023 |
GREAT MISSENDEN CP | GREAT MISSENDEN | TTRO: CARRIAGEWAY, FOOTWAY, VERGE | WORKS BY: AFFINITY WATER - C | ROAD CLOSURE | SPURLANDS END ROAD, GREAT KINGSHILL - ROSADEL, SPURLANDS END ROAD, GREAT KINGSHILL, HIGH WYCOMBE, HP15 6HX | 12/01/2023 | 17/01/2023 |
HADDENHAM CP | BERNWOOD | TTRO: VERGE | WORKS BY: BT | ROAD CLOSURE | ROSEMARY LANE, HADDENHAM - 20 ROSEMARY LN, HADDENHAM, HP17 8JP | 11/01/2023 | 13/01/2023 |
NON-CIVIL PARISH OR COMMUNITY | TOTTERIDGE & BOWERDEAN | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | NO CARRIAGEWAY INCURSION | COLBORNE ROAD, HIGH WYCOMBE - WHOLE STREET FROM J/O HILL VIEW ROAD | 03/01/2023 | 06/02/2023 |
WEST WYCOMBE CP | WEST WYCOMBE | TTRO: CARRIAGEWAY, FOOTWAY, VERGE | WORKS BY: CITYFIBRE METRO NETWORKS LTD | ROAD CLOSURE | TOWERIDGE LANE, HIGH WYCOMBE - F/W S/O 62 CHAPEL LANE. C/W S/O 62 CHAPEL LANE O/S WHITELEAF | 09/01/2023 | 24/01/2023 |
CHALFONT ST PETER CP | CHALFONT ST PETER | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CITYFIBRE METRO NETWORKS LTD | GIVE AND TAKE (1) | PLOMER HILL, HIGH WYCOMBE | 03/01/2023 | 03/02/2023 |
NON-CIVIL PARISH OR COMMUNITY | WEST WYCOMBE | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | TWO-WAY SIGNALS | WEST WYCOMBE ROAD, HIGH WYCOMBE - O/S NO 323 - S/O NO 14-24 | 09/01/2023 | 10/04/2023 |
CHARTRIDGE CP | CHILTERN RIDGES | TTRO: CARRIAGEWAY | WORKS BY: THAMES WATER | ROAD CLOSURE | FULLERS HILL, HYDE HEATH - FROM O/S LITTLE GERMAINS TO 91 FULLERS HILL | 15/01/2023 | 15/01/2023 |
LITTLE CHALFONT CP | LITTLE CHALFONT & AMERSHAM COMMON | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | ROAD CLOSURE | COKES LANE, LITTLE CHALFONT - J/O COKES FARM LANE/DOGGETTS WOOD LANE | 09/01/2023 | 20/01/2023 |
MURSLEY CP | GREAT BRICKHILL | TTRO: VERGE | WORKS BY: BT | ROAD CLOSURE | STEWKLEY LANE, MURSLEY - ADJACENT RICHMOND LODGE, STEWKLEY LANE, MURSLEY, BUCKINGHAMSHIRE, MK17 0JD | 13/01/2023 | 16/01/2023 |
PADBURY CP | WINSLOW | TTRO: CARRIAGEWAY, FOOTWAY, VERGE | WORKS BY: GIGACLEAR LIMITED | ROAD CLOSURE | LOWER WAY, PADBURY - WHOLE STREET | 09/01/2023 | 20/01/2023 |
SHABBINGTON CP | BERNWOOD | TTRO: VERGE | WORKS BY: BT | ROAD CLOSURE | MILL ROAD, SHABBINGTON - O/S ASH TREE COTTAGE, MILL ROAD, SHABBINGTON, BUCKINGHAMSHIRE HP18 9HQ | 12/01/2023 | 16/01/2023 |
SWANBOURNE CP | GREAT BRICKHILL | TTRO: VERGE | WORKS BY: BT | ROAD CLOSURE | STATION ROAD, SWANBOURNE - NO PIN PIONT, STATION ROAD, DODLEYHILL FARM, SWANBOURNE, BUCKINGHAMSHIRE, MK17 0SW | 13/01/2023 | 17/01/2023 |
HAZLEMERE CP | HAZLEMERE | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CADENT GAS LIMITED | SOME CARRIAGEWAY INCURSION | ST JOHNS AVENUE, TYLERS GREEN - WHOLE STREET FROM J/O ST. JOHNS ROAD TO O/S NO.14 | 03/01/2023 | 06/02/2023 |
CHALFONT ST PETER CP | CHALFONT ST PETER | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CITYFIBRE METRO NETWORKS LTD | GIVE AND TAKE (2) | PLOMER HILL, HIGH WYCOMBE | 09/01/2023 | 10/02/2023 |
CHESHAM CP | CHESS VALLEY | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK, STOP & GO - RESTRICTED HOURS (2) | BROAD STREET, CHESHAM | 16/01/2023 | 16/01/2023 |
CHESHAM CP | CHESHAM | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK - RESTRICTED HOURS (2) | BRUSHWOOD ROAD, CHESHAM | 16/01/2023 | 16/01/2023 |
AKELEY CP | BUCKINGHAM EAST | ROAD LINING | ROAD MARKING REFRESH | STOP & GO - RESTRICTED HOURS - NIGHTS | CHURCH HILL, AKELEY | 13/01/2023 | 13/01/2023 |
BUCKINGHAM CP | BUCKINGHAM WEST | ROAD LINING | ROAD MARKING REFRESH | NIGHT WORK - STOP & GO - NIGHTS | HUNTER STREET, BUCKINGHAM | 13/01/2023 | 13/01/2023 |
MARLOW CP | MARLOW | ROAD LINING | ROAD MARKING REFRESH | STOP & GO - RESTRICTED HOURS - NIGHTS | POUND HILL, GREAT BRICKHILL | 13/01/2023 | 13/01/2023 |
CHESHAM CP | CHESS VALLEY | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK, STOP & GO - RESTRICTED HOURS | ALBERT ROAD, CHESHAM | 16/01/2023 | 16/01/2023 |
CHARTRIDGE CP | CHILTERN RIDGES | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK | BARNES AVENUE, CHESHAM | 16/01/2023 | 16/01/2023 |
CHESHAM CP | CHESS VALLEY | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK | BROADLANDS AVENUE, CHESHAM | 16/01/2023 | 16/01/2023 |
CHESHAM CP | CHESS VALLEY | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK, STOP & GO - RESTRICTED HOURS | ELGVIA LANE, CHESHAM | 16/01/2023 | 16/01/2023 |
CHESHAM CP | CHESS VALLEY | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK, STOP & GO - RESTRICTED HOURS (1) | GLADSTONE ROAD, CHESHAM | 16/01/2023 | 16/01/2023 |
CHESHAM CP | CHESS VALLEY | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK, STOP & GO - RESTRICTED HOURS (2) | GLADSTONE ROAD, CHESHAM | 17/01/2023 | 17/01/2023 |
CHESHAM CP | CHESS VALLEY | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK, STOP & GO - RESTRICTED HOURS | HIGH STREET, CHESHAM | 16/01/2023 | 16/01/2023 |
CHESHAM CP | CHESS VALLEY | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK- RESTRICTED HOURS | HILL FARM ROAD, CHESHAM | 16/01/2023 | 16/01/2023 |
CHESHAM CP | CHESS VALLEY | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK- RESTRICTED HOURS | LATIMER ROAD, CHESHAM | 16/01/2023 | 16/01/2023 |
CHESHAM CP | CHESS VALLEY | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK, STOP & GO - RESTRICTED HOURS | THE BACKS, CHESHAM | 16/01/2023 | 16/01/2023 |
CHESHAM CP | CHESS VALLEY | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK, STOP & GO - RESTRICTED HOURS | VICTORIA ROAD, CHESHAM | 16/01/2023 | 16/01/2023 |
CHESHAM CP | CHESS VALLEY | ROAD LINING | ROAD MARKING REFRESH | 2 WAY TRAFFIC LIGHTS- RESTRICTED HOURS | WHITE HILL, CHESHAM | 16/01/2023 | 16/01/2023 |
CHESHAM BOIS CP | AMERSHAM & CHESHAM BOIS | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK- RESTRICTED HOURS | AMERSHAM ROAD, CHESHAM | 17/01/2023 | 17/01/2023 |
CHESHAM CP | CHILTERN RIDGES | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK, STOP & GO - RESTRICTED HOURS | BELLINGDON ROAD, CHESHAM | 17/01/2023 | 17/01/2023 |
CHESHAM CP | CHESS VALLEY | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK, STOP & GO - RESTRICTED HOURS | HIGHAM ROAD, CHESHAM | 17/01/2023 | 17/01/2023 |
CHESHAM CP | CHESS VALLEY | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK, STOP & GO - RESTRICTED HOURS | PARK ROAD, CHESHAM | 17/01/2023 | 17/01/2023 |
CHESHAM CP | CHESS VALLEY | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK, STOP & GO - RESTRICTED HOURS | QUEENS ROAD, CHESHAM | 17/01/2023 | 17/01/2023 |
CHESHAM CP | CHESS VALLEY | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK | STANLEY AVENUE, CHESHAM | 17/01/2023 | 17/01/2023 |
CHESHAM CP | CHESS VALLEY | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK, STOP & GO - RESTRICTED HOURS | UPPER GLADSTONE ROAD, CHESHAM | 17/01/2023 | 17/01/2023 |
CHESHAM CP | CHILTERN RIDGES | ROAD LINING | ROAD MARKING REFRESH | MOBILE WORK | BELLINGDON ROAD, CHESHAM | 17/01/2023 | 17/01/2023 |
LITTLE MISSENDEN CP | PENN WOOD & OLD AMERSHAM | TTRO: CARRIAGEWAY | WORKS BY: BT | ROAD CLOSURE | BEAMOND END LANE, BEAMOND END - OUTSIDE NEILD HOUSE BEAMOND END LANE BEAMOND END HP7 0QT | 16/01/2023 | 18/01/2023 |
BEACONSFIELD CP | BEACONSFIELD | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: AFFINITY WATER - C | ROAD CLOSURE | STRATTON ROAD, BEACONSFIELD - OUTSIDE 26 | 18/01/2023 | 20/01/2023 |
STOKE POGES CP | STOKE POGES & WEXHAM | TTRO: VERGE | WORKS BY: BT | ROAD CLOSURE | DUFFIELD LANE, STOKE POGES - 86 DUFFIELD LANE, STOKE POGES, BUCKINGHAMSHIRE, ENGLAND SL2 4AJ | 20/01/2023 | 21/01/2023 |
STOKE POGES CP | STOKE POGES & WEXHAM | TTRO: VERGE | WORKS BY: BT | ROAD CLOSURE | DUFFIELD LANE, STOKE POGES - O/S THE FIRS, DUFFIELD LANE, STOKE POGES, BUCKINGHAMSHIRE SL2 4AJ | 20/01/2023 | 21/01/2023 |
WEST WYCOMBE CP | WEST WYCOMBE | TTRO: CARRIAGEWAY, FOOTWAY, VERGE | WORKS BY: CITYFIBRE METRO NETWORKS LTD | ROAD CLOSURE | TOWERIDGE LANE, HIGH WYCOMBE - F/W S/O 62 CHAPEL LANE. C/W S/O 62 CHAPEL LANE Ï¿½ O/S WHITELEAF | 09/01/2023 | 24/01/2023 |
FARNHAM ROYAL CP | STOKE POGES & WEXHAM | TTRO: VERGE | WORKS BY: BT | ROAD CLOSURE | PURTON LANE, FARNHAM ROYAL - O/S NO. 1 PURTON LANE, FARNHAM ROYAL, FARNHAM COMMON, BUCKINGHAMSHIRE SL2 3PE | 20/01/2023 | 21/01/2023 |
ADDINGTON CP | WINSLOW | TTRO: CARRIAGEWAY | WORKS BY: NETWORK RAIL | ROAD CLOSURE | VERNEY ROAD, ADDINGTON - PLEASE SEE CO-ORDS | 09/01/2023 | 20/01/2023 |
GREAT MISSENDEN CP | GREAT MISSENDEN | TTRO: CARRIAGEWAY, VERGE | WORKS BY: AFFINITY WATER - C | ROAD CLOSURE | NAGS HEAD LANE, GREAT MISSENDEN - OUTSIDE THE BEECHES | 21/01/2023 | 22/01/2023 |
BLEDLOW-COM-SAUNDERTON CP | RIDGEWAY WEST | TTRO: CARRIAGEWAY | WORKS BY: BUCKINGHAMSHIRE COUNCIL | STOP/GO BOARDS | WIGANS LANE, BLEDLOW RIDGE - WIGANS LANE | 16/01/2023 | 12/02/2023 |
BUCKLAND CP | ASTON CLINTON & BIERTON | COMMUNITY BOARD SCHEME 2022-23 | BOLLARDS | INSTALLATION OF BOLLARDS | BUCKLAND ROAD, BUCKLAND WHARF | 01/02/2023 | 02/02/2023 |
NON-CIVIL PARISH OR COMMUNITY | TERRIERS & AMERSHAM HILL | COMMUNITY BOARD SCHEME 2022-23 | DROPPED KERBS PROGRAMME | INSTALLATION OF DROPPED KERBS | PARSONAGE CLOSE, HIGH WYCOMBE | 13/02/2023 | 17/02/2023 |
BURNHAM CP | CLIVEDEN | COMMUNITY BOARD SCHEME 2022-23 | KERBS, FOOTWAYS & PAVED AREA | PEDESTRIAN DROPPED KERB & TACTILE PAVING | HIGH STREET, BURNHAM | 06/02/2023 | 09/02/2023 |
GRENDON UNDERWOOD CP | GRENDON UNDERWOOD | TTRO: CARRIAGEWAY | WORKS BY: UK POWER NETWORKS EASTERN & LONDON | MULTI-WAY SIGNALS | GRENDON ROAD, EDGCOTT - ENTRANCE TO HMP SPRINGHILL | 16/01/2023 | 08/03/2023 |
BIERTON CP | ASTON CLINTON & BIERTON | COMMUNITY BOARD SCHEME 2022-23 | BURCOTT LANE PARKING RESTRICTIONS | DOUBLE YELLOW LINES | BURCOTT LANE JCT AYLESBURY ROAD, WENDOVER | 13/01/2023 | 13/01/2023 |
BLEDLOW-COM-SAUNDERTON CP | RIDGEWAY WEST | TTRO: CARRIAGEWAY, VERGE | WORKS BY: THAMES WATER | TWO-WAY SIGNALS | CHINNOR ROAD, BLEDLOW RIDGE - FROM JUNC OF CHAPEL LANE TO O.S WHITELEAF | 03/01/2023 | 21/02/2023 |
NON-CIVIL PARISH OR COMMUNITY | DOWNLEY | TTRO: CARRIAGEWAY, FOOTWAY | WORKS BY: CITYFIBRE METRO NETWORKS LTD | SOME CARRIAGEWAY INCURSION | DOWNS PARK, HIGH WYCOMBE - FW O/S 3- O/S 38 HITHERCROFT RD, O/S 40- O/S 2 | 03/01/2023 | 24/01/2023 |
NON-CIVIL PARISH OR COMMUNITY | DOWNLEY | TTRO: CARRIAGEWAY, FOOTWAY, VERGE | WORKS BY: CITYFIBRE METRO NETWORKS LTD | GIVE AND TAKE | MALVERN CLOSE, HIGH WYCOMBE | 03/01/2023 | 07/02/2023 |
NORTH MARSTON CP | GREAT BRICKHILL | COMMUNITY BOARD SCHEME 2022-23 | KERBING | | SCHOOL HILL, NORTH MARSTON | 13/02/2023 | 17/02/2023 |
LITTLE MISSENDEN CP | PENN WOOD & OLD AMERSHAM | TTRO: CARRIAGEWAY, FOOTWAY, VERGE | WORKS BY: GIGACLEAR LIMITED | GIVE AND TAKE | WALNUT WAY, HYDE HEATH - WHOLE STREET | 03/01/2023 | 06/02/2023 |
FARNHAM ROYAL CP | FARNHAM COMMON & BURNHAM BEECHES | COMMUNITY BOARD SCHEME 2022-23 | INSTALLATION OF NEW FOOTWAY | | BLACKPOND LANE, FARNHAM COMMON | 09/01/2023 | 03/02/2023 |
BUCKINGHAM CP | BUCKINGHAM EAST | VRS | SAFETY BARRIER (VRS) | SAFETY BARRIER REPAIR / UPGRADE | PAGE HILL ROUNDABOUT, BUCKINGHAM | 16/01/2023 | 16/01/2023 |
STOKE HAMMOND CP | GREAT BRICKHILL | VRS | SAFETY BARRIER (VRS) | SAFETY BARRIER REPAIR / UPGRADE | A4146 LINSLADE WESTERN BYPASS / WILLOWBRIDGE | 17/01/2023 | 19/01/2023 |
BEACONSFIELD CP | GERRARDS CROSS | VRS | SAFETY BARRIER (VRS) | SAFETY BARRIER REPAIR / UPGRADE | A355 / M40 ROUNDABOUT JUNCTION, BEACONSFIELD | 20/01/2023 | 20/01/2023 |